School Taps Into PTSG’s Water Treatment Expertise
Premier Technical Services Group Ltd (PTSG), via Total Environmental Compliance (TEC), has successfully completed a water treatment project within the education sector.
A modern secondary school building, constructed in 2019 was experiencing continual water pressure and temperature issues. There was a temperature variance of >two degrees between source and outlet and the incoming pressure was 1.5bar, not adequate for a site of that scale.
The specialist team from TEC carried out a thorough site survey to propose a range of suitable solutions that would work within the confines of the site restrictions.
Its engineers installed a CWST tank (11,717L) and a 2' Twin Variable Speed Vertical Booster Pump Set, customising the installation to fit within the limited floor space area.
This project, delivered within budget and timeframe, saw TEC working closely with multiple specialists to coordinate a seamless installation alongside its tank manufacturers, PTSG Electrical Services Ltd and EFAFLU UK LTD (booster set commissioners).
The pressure and temperature issues have been resolved; the system now operates at 3.5bar across the estate and the temperature is within the two‑degree variance.
PTSG is a trusted partner for clients in all industry sectors. Its services ensure the safe management of water systems, with protection from Legionella and compliance with the necessary regulations. Its focus is on reliability and sustainability and saving companies time and money.
PTSG operates five independent business divisions: PTSG Access & Safety Ltd, PTSG Electrical Services Ltd, PTSG Building Access Specialists Ltd, PTSG Fire Solutions Ltd and PTSG Water Treatment Ltd.
Contact PTSG to find out more about the company’s specialist services, or for a free, no-obligations quote:
T: 01977 668771 E: This email address is being protected from spambots. You need JavaScript enabled to view it. W: www.ptsg.co.uk
Click the article to enlarge it.